Astroturf Pitch Construction

Working for Nightingale Associates on the remodelling scheme at the Blue Coat School in Liverpool, Blakedown Sport & Play constructed a full-size FIH approved sand-filled (astroturf) hockey pitch for hockey and football use.

  • Client: Nightingale Associates
  • Contract Type: JCT CD
  • Contract Value: £305,000
  • Build Time: 18 weeks

The existing area was very uneven, and consisted largely of hard sandstone substrate. A substantial ‘cut and fill’ operation was required to produce the required levels for installation. The facility was completed with new weldmesh fencing and floodlighting./p>

Location: Woolton Road, Liverpool, L15 9EE

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved