3G football pitch resurfaced with Edel Superblade

Following direct negotiations, Mitie appointed Blakedown Sport & Play to resurface the dilapidated 3G pitch at Burnside Business and Enterprise College in Wallsend.

  • Client: Mitie (Main Contractor)
  • Contract Type: Direct order
  • Contract Value: £180,000
  • Build Time: 7 weeks

The original pitch was unusable due to wide-spread wear from extensive use and lack of regular maintenance. Allowance had been made to make remedial repairs to the in-situ shockpad, however once the existing 3G carpet was fully removed it was ascertained that it needed fully replacing. Once done, a new Edel Superblade 40mm 3G carpet with woven white lines for football was installed.

Blakedown worked with the football club to design and build this excellent installation to meet both budget and programme.

Location: St Peter's Road, Wallsend, Tyne and Wear, NE28 7LQ

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved