Edel LSR/NDR sand-dressed pitch

After the successful completion of the resurfacing of an existing sand-filled pitch at Dauntsey’s School in Wiltshire, Blakedown Sport & Play won the next contract to install a new hockey pitch.

The 101.5m x 63m FIH certified pitch has a sand-dressed Edel LSR/NDR carpet with 12mm shockpad, installed because the pitch is also used for tennis.

  • Client: Dauntsey's School
  • Contract Type: JCT with CD
  • Contract Value: £500,000
  • Build Time: 16 weeks

Adjacent to the hockey pitch, Blakedown Sport & Play also installed a sand-dressed training facility. Once completed, our sister company Blakedown Landscapes won the £1m external works contract at the school through Easdon Cole Consultants. This contract included new coach routes, a large car park, three grass rugby pitches, a cricket oval, and a grass athletics track.

Location: West Lavington, Devizes, Wiltshire, SN10 4HE

The new pitch was opened by Simon Mason, GB Hockey Goalkeeper

The new pitch was opened by Simon Mason, GB Hockey Goalkeeper.

The debut game on the new pitch

The debut game on the new pitch.

The construction included a tarmac spectator area and railing

The construction included a tarmac spectator area and railing.

The selected playing surface was Edel's LSR/NDR sand-dressed synthetic turf

The selected playing surface was Edel's LSR/NDR sand-dressed synthetic turf.

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved