Tel: 01295 738238   Email: marketing@blakedown.co.uk

Water-based Hockey Pitch

Blakedown were chosen by Hertsmere Borough Council to complete the top-specification water-based synthetic hockey pitch at the Furzefield Centre in Potters Bar.

Client: Hertsmere Borough Council

Value: £305,000

Build Time: 12 weeks

The project involved pulling up an existing worn surface and e-layer, realigning the levels across the base, new kerbing, installation of an irrigation system, installation of an Engineered porous tarmac layer, installation of a new in-situ shockpad, and laying of the playing surface: Edel’s Classic LSR WB turf.

Blakedown also upgraded the facility with new footpaths and resurfaced access ways.

Location: Mutton Lane, Potters Bar, Hertfordshire EN6 3BW

Water-based hockey pitch
Water based artificial turf
Hockey pitch at the Furzefield Centre
Water-based pitch London

Contact us about the construction of water-based pitches

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Our services in summary...

Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved