Water-based Hockey Pitch

Blakedown were chosen by Hertsmere Borough Council to complete the top-specification water-based synthetic hockey pitch at the Furzefield Centre in Potters Bar.

  • Client: Hertsmere Borough Council
  • Contract Value: £305,000
  • Build Time: 12 weeks

The project involved pulling up an existing worn surface and e-layer, realigning the levels across the base, new kerbing, installation of an irrigation system, installation of an Engineered porous tarmac layer, installation of a new in-situ shockpad, and laying of the playing surface: Edel’s Classic LSR WB turf.

Blakedown also upgraded the facility with new footpaths and resurfaced access ways.

Location: Mutton Lane, Potters Bar, Hertfordshire EN6 3BW