3G Football and Hockey pitch

Following the successful build of a full-size sand-filled pitch at Hurstmere School in Sidcup, Blakedown were invited back to design and build a new 3G pitch extending the school’s extensive sports provision.

  • Client: Hurstmere School
  • Contract Type: Direct Order
  • Contract Value: £230,000
  • Build Time: 8 weeks

As well as designing the facility, Blakedown assisted the school with planning and submitted the planning application which was accepted by the local authority. The 3G artificial sports turf was laid onto a top specification engineered base of porous tarmac with a 15mm in-situ rubber shockpad. Sports lined seamed into the turf included three cross-play 5-a-side pitches as well as the main football layout. To complete the project, Blakedown installed 5m high twinbar fencing with goal recesses.

Location: Hurst Road, Sidcup, DA15 9AW

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved