Triple 3G Resurfacing

Blakedown Sport & Play have completed the resurfacing of three synthetic sports pitches at Kimberley Leisure Centre in Nottingham for Broxtowe Borough Council.

  • Client: Broxtowe Borough Council
  • Contract Value: £183,000
  • Build Time: 10 weeks

The existing full-size sand-dressed pitch has been converted to a Third Generation rubber-filled surface which is much more suitable for football. The two existing 7-a-side 3G pitches have also been resurfaced with an upgraded artificial turf product.

The selected turf was iDNA 50mm Monofilament from FIFA-preferred producer Desso. The Council has arranged for all of the pitches to be tested and certified to FIFA playing standards

Location: Newdigate Street, Kimberley, Nottingham, NG16 2NJ

3G pitch construction for Kimberley Leisure Centre
Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved