Blakedown Sport & Play completed the long pile 3rd Generation pitch, meeting IRB Regulation 22 and tested to FIFA 2 Star standards, plus perimeter twin-bar fencing, goal recesses, and floodlighting in front of the main college building.

  • Client: Globe Management Services (Main Contractor)
  • Contract Type: S/C JCT Intermediate
  • Contract Value: £475,000
  • Build Time: 12 weeks

The installation of the 3G pitch onto an Engineered base of stone and porous tarmac with shockpad used a Desso 65mm surface lined for rugby, football and three cross-play 5-a-side pitches which can be sectioned off using retractable dividing nets.

As part of the works, Blakedown also constructed a row of acrylic-coated tarmac courts lined for tennis and netball, peripheral landscaping works, plus access ways to both facilities.

Location: Morcambe Road, Lancaster, LA1 2TY