Tel: 01295 738238   Email: marketing@blakedown.co.uk

Sand-filled pitch with landscaping

Blakedown were contracted by Powys County Council to construct of a full-size sand-filled hockey pitch built on an Engineered base with 15mm in-situ shockpad.

Client: Powys County Council

Contract Type: JCT

Value: £380,000

Build Time: 14 weeks

The project included fencing, floodlighting, tarmac pathways, and a 40m long, 3m high stone brick retaining wall along one side of the pitch embankment.

Location: Dyffryn Road, Llandrindod Wells, Llanelli, LD1 6AN

Contact us about the construction of sand-filled pitches

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Our services in summary...

Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved