Facilities for hockey, football and cricket

Blakedown were contracted by Powys County Council to construct of a full-size sand-filled hockey pitch built on an Engineered base with 15mm in-situ shockpad.

  • Client: Powys County Council
  • Contract Type: JCT
  • Contract Value: £380,000
  • Build Time: 14 weeks

The project included fencing, floodlighting, tarmac pathways, and a 40m long, 3m high stone brick retaining wall along one side of the pitch embankment.

Location: Dyffryn Road, Llandrindod Wells, Llanelli, LD1 6AN

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved