Tel: 01295 738238   Email: marketing@blakedown.co.uk

3G Football and Volleyball MUGA

Blakedown Sport & Play were chosen for the construction of a 34.75m x 17m 3G multi-use games area for volleyball and 5-a-side football at Loughborough University’s Games Park.

Client: Loughborough University

Value: £146,000

Build Time: 10 weeks

Situated next to the university’s EHB sand-dressed pitch, an extensive cut and fill operation was required together with the construction of a new retaining wall, new tarmac access paths and landscaped grass banks. The MUGA was built onto an engineered base of tarmac with full drainage system, and the 3G rubber-filled playing surface selected for the pitch was Edel's Superblade sports turf. Sports lines seamed into the turf include a central volleyball court with 5-a-side football goal areas at each end.

The facility was completed with 3m high twinbar fencing along three sides, 1.2m high spectator fencing down the remaining side, and recessed goal ends; all painted in the purple colour of Loughborough Sport: Pantone 269c. Blakedown also installed four corner floodlights, purple-coloured spectator seating, and retractable divider netting. Fittingly, Loughborough University was named 'University of the year for sport' in The Times Good University Guide 2014 after the MUGA had been completed.

Location: Epinal Way, Loughborough, LE11 3TU

3G Volleyball pitch
  • thumbnail
  • thumbnail
  • thumbnail
  • thumbnail

Contact us about the construction of multi-use games areas

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Our services in summary...

Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved