3G Pitch Resurface

Having constructed the original sand-filled synthetic pitch for Newall Green High School in Wythenshawe, Blakedown were later asked back to resurface to a state-of-the-art Third Generation pitch. The original facility was installed with an eight column floodlighting scheme, 5m high weldmesh perimeter fencing, 10m extended ball-capture fencing on the housing-side, and a spectator mound formed using earth taken from the cut-and-fill and levelling operation as part of the build.

Client: Newall Green High School

Value: £140,000

Build Time: 5 weeks

The sports turf selected for resurfacing the facility was Edel's Superblade Duo 40 with sports lines in-laid for full-size football and hockey with three cross-play 7-a-side football pitches. Turf-covered timber kickboards were also installed around the perimeter of the playing surface.

Location: Greenbrow Road, Wythenshawe, Manchester, M23 2SX

Contact us about the construction of 3G football pitches

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Our services in summary...

Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved