Polymeric MUGA & 3G 5-a-side

Blakedown Sport & Play were employed by main contractor Kier to provide a polymeric MUGA at Uxbridge College in Middlesex. The 32m x 25m surface was coloured in blue and lined for three courts: tennis in white, basketball in red, and netball in yellow.

  • Client: Kier London (Main Contractor)
  • Contract Value: £106,000
  • Build Time: 4 weeks

Floodlights were installed within the site footprint and columns fitted with crash-padding to maintain safety. The MUGA was completed with 3m high green-coloured twin-bar fencing. Blakedown also installed the 5-a-side 3G football pitch adjacent to the MUGA with shared floodlighting scheme.

Location: Park Road, Uxbridge, UB8 1NQ

Blakedown Sport & Play Ltd. | Copyright 2018 | All rights reserved