Sand-filled Tennis Court Re-construction

Blakedown Sport & Play were awarded the contract to reconstruct the tennis facilities at Watford Grammar School for Boys. The site footprint measured 67m x 31m onto which a sand-filled (astroturf) sports turf was laid. Six new floodlighting columns were erected providing 350lux brilliance with minimal light spillage.

  • Client: Watford Grammar School for Boys
  • Contract Value: £150,000
  • Build Time: 10 weeks

The synthetic turf product selected was Edel's 24mm LSR laid on top of a 10mm shockpad with white lines for tennis seamed into the turf. Blakedown also reconstucted the two-layer macadam base and surrounding kerbing.

To complete the reconstruction, 3m high weldmesh fencing was installed with 1.2m high wooden kickboarding and a 2.75m high divider netting rail to separate each set of courts.

Location: Rickmansworth Road, Watford, Hertfordshire, WD18 7JF