Tel: 01295 738238   Email: marketing@blakedown.co.uk

Long-awaited Hockey Pitch

Blakedown Sport & Play were employed directly by Wellington School in Altrincham to construct a full-size sand-dressed hockey pitch. Previously the school had three planning applications refused for the pitch; but with Blakedown’s design of a new drainage scheme, planning was finally achieved.

Client: Wellington School

Contract Type Direct Order

Value: £415,000

Build Time: 14 weeks

The pitch was constructed on a top-specification engineered tarmac double layer, with a 15mm in-situ shockpad. The school specified their preference of playing surface: Lano’s FIH approved Integration sand-dressed turf installed with gripper rail to provide an excellent multi-use facility.

The pitch was enclosed with heavy-duty twinbar fencing and recessed goals, plus timber kickboard skirting fitted with sports turf to abate noise from ball impact. To complete the project, Blakedown supplied self-weighted football goals, hockey goals, 5-a-side goals and installed a divider netting system so that the pitch can be separated into three mini-pitches.

Location: Wellington Road, Altrincham, WA15 7RH

  • thumbnail
  • thumbnail
  • thumbnail
  • thumbnail

Contact us about the construction of hockey pitches

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved