3-Phase Re-developement Plan

Working for Main Contractor Kier Moss Construction, Blakedown Sport & Play have completed the sub-contract works in three phases on the William Brookes School re-development program.

Phase 1 of the project involved the construction of a new 200 metre, polymeric, 6-lane running track with an 8 lane sprint straight, and a 101.5 x 63 metre sand-filled astroturf pitch using an Edel LSR 24mm carpet.

  • Client: Kier Moss Construction
  • Contract Value: £522,000
  • Build Time: 22 weeks

Phase 2 of the works saw the construction of a 75m x 35m macadam MUGA which was centrally divided by fencing to allow for two courts, both lined for tennis and netball, and one lined for basketball; allowing for maximum usage of the courts during lessons. A new natural grass rugby pitch was completed in Phase 3.

Location: Farley Road, Much Wenlock, Shropshire, TF13 6NB