3G pitch with grass training area

Blakedown Sport & Play have constructed a 106 x 71m 3G artificial turf pitch and a grass football training area within a landscaped setting at Woodchurch High School in Wirral. The excavation of soil and groundworks was completed during winter so that the pitch would be ready in time for summer.

  • Client: Wirral Borough Council
  • Contract Type: JCT Design & Build
  • Contract Value: £505,000
  • Build Time: 16 weeks

The selected playing surface for the 3G pitch was Edel’s Superblade Duo sports turf which was laid onto a dynamic stone base. The project was completed with an eight column 200lux floodlighting system and 3m high twinbar fencing, extended to 5m behind the goal areas.

Location: Carr Bridge Road, Wirral, CH49 7NG