Sand-filled Tennis Court Construction

Following extensive refurbishment works to other sports surfaces at Wycombe Rye Lido & Leisure Centre, Fusion Lifestyle came directly to Blakedown Sport & Play to resurface their worn tennis courts. The tarmac courts were in desperate need of repair and a synthetic turf was chosen as the new playing surface in order to accommodate a greater variety of sports.

  • Client: Fusion Lifestyle
  • Contract Type: Direct Order
  • Contract Value: £43,000
  • Build Time: 4 weeks

Blakedown first carried out extensive repairs to the court’s foundations, laid a new shockpad, and then installed the 20mm sand-filled (astroturf) carpet. Tennis markings for three courts were in-laid, plus markings for 5-a-side football in red. The project was completed with a divider netting system to separate the football pitches.

Location: Bassetsbury Lane, High Wycombe, HP11 1QX

Tennis court construction for Wycombe Rye Lido