Tel: 01295 738238   Email: marketing@blakedown.co.uk

New hockey and football astroturf

Conwy Borough Council employed Blakedown Sport & Play to construct a new artificial turf pitch for hockey and football at the Bryn Elian school in Colwyn Bay. The size of the pitch was 85m by 58m with sports lines seamed into the turf.

Client: Conwy County Council

Contract Type: JCT

Value: £400,000

Build Time: 15 weeks

The construction consisted of excavating and re-grading a large volume of earth, installation of a dynamic stone sub-base, and the laying of NottsSports envelope system as the playing surface. The project included the installation of a 300lux ‘raise and lower’ floodlighting system, 3m twinbar fencing surrounding the pitch, new goals and sports equipment, and new footpaths for access to the pitch.

To keep the scheme in sympathy with its surroundings, the project was finished with 1.2m post-and-rail pine and weldmesh perimeter fencing, pine kickboards, and a tarmac spectator area and external perimeter footpath.

Location: Bodlondeb, Bangor Road, Conwy, LL32 8DU

Contact us about the construction of sand-filled pitches

Tel: 01295 738238 | Email: marketing@blakedown.co.uk



Blakedown Sport & Play Ltd. | Established 1968 | Copyright © 2017 | All rights reserved