On site progress at Perry Brook

We have been working on a project in Perry Brook, Brockworth, Gloucester and work on site is progressing well. We are currently installing 2 full size pitches, as well as a 9-a-side and a 7-a-side pitch, totalling 28,000m. To add to this, the site will also feature an acrylic MUGA car park, completed with planting and an access road to allow visitors in and out of the grounds. The programme duration will be approximately 26 weeks.

Be sure to check out the overhead shots of the scheme as well as some on site photos.

We look forward to completing this space which will provide key sports facilities for the local area.

Chris Wellbelove