Wyre Forest Leisure Centre

Client: Pellikaan Construction Ltd

Form of Contract: S/C Order

Contract Value: £236,000

Contract Duration: 14 Weeks

This project involved the construction of five no. 30x20m 5-a-side and one no. 60x40m 7-a-side, all constructed with 50mm 3G FIFA standard synthetic grass onto an engineered base.

A comprehensive drainage system with attenuation was installed to meet planning regulations.

A 3m high twin bar rebound fence and a LED floodlighting System was included.