Stockland Green School
3G Football Pitch Construction
Client: Stockland Green School
Contract Value: £591,635
Build Time: 14 weeks
Location: Slade Road, Birmingham, B23 7JH
Blakedown Sport and Play worked in conjunction with the consultant, Pennycuick Ltd, the school, and the local authority to design and build this excellent facility.
Implemented within a 16-week program, a fully engineered 74m x 50m 3G pitch was constructed to FIFA quality. This included a 3m high perimeter sports fence and a high-quality floodlighting system.
The project was completed with an extensive landscaping package that included the provision of two large timber gazebo classrooms, seating areas, planting, and a 40m polymeric runway and landing pit for long and triple jump.